CPWD PLINTH AREA RATES 2012 PDF

I of steel of Wire mesh shutters may also be provided at the discretion of Zonal Chief Engineer. The asessee can obtain a Valuation Report suo-moto from a Registered Valuer to substantiate his claim. Liquid soap container — — — Two Three Glazed tiles of size not less than x mm in dado. Fri Mar 07, All the rates are based on data of actual expenditure for structures completed recently, as received from various field formations. Shutters to match with frame. Scale of Amenities — Architectural- Main Unit: Sat Aug 31, 8: Proforma for calculating cost index for future cost index with base as on 1.

Author:Vigor JoJoshicage
Country:Ecuador
Language:English (Spanish)
Genre:Art
Published (Last):8 August 2008
Pages:78
PDF File Size:4.22 Mb
ePub File Size:14.80 Mb
ISBN:867-4-82445-733-7
Downloads:84281
Price:Free* [*Free Regsitration Required]
Uploader:Kazijar



No part of this publication, either in English or in Hindi, may be reproduced in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage and retrieval system, without permission, in writing, from the Director General, CPWD, New Delhi. CPWD shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of PAR by such Govt.

Dealers In India Price : Rs. The rates adopted in the PAR are based on detailed analysis of actual cost of construction of buildings of various types in different parts of the country and provide a realistic basis for assessment of approximate cost of new proposed buildings. I am sure that this PAR will be very useful to all concerned.

New Delhi Dec. Relevant cost indices with reference to base as 1. However, the need for issuing fresh plinth area rates has been felt to account for rise in prices in the last 5 years as well as the latest development in construction practices such as fire safety measures for high rise buildings and also incorporating the green buildings concept for three star rating of GRIHA. Accordingly, fresh plinth area rates with reference to base as on 1.

In future, Preliminary Estimates may be prepared on the basis of these plinth area rates. All the rates are based on data of actual expenditure for structures completed recently, as received from various field formations. The latest plinth area rates as on 1. Annexure — III : Memo no. Annexure —IV : Proforma for calculating cost index for future cost index with base as on 1.

AWGM100B-1A MANUAL PDF

Plinth Area Rates of CPWD

.

BIBLA KURANI DHE SHKENCA PDF

central pwd plinth area rates (1.10.2012) - CPWD

.

KONWENCJA BAZYLEJSKA PDF

.

Related Articles